

First Niger Bridge to Shut Monday for Emergency Repairs
Motorists using the busy Onitsha–Asaba corridor have just days to find alternative routes as the Federal Government moves to shut the First Niger Bridge from Monday, September 7, for emergency repairs.
The two-week closure, which runs until Monday, September 21, 2026, is expected to affect one of the busiest gateways between the South-East and other parts of the country.
This was announced by the Federal Ministry of Works through its Anambra State Field Headquarters, saying urgent repairs are needed to address vandalisation and the deteriorating condition of parts of the bridge.
The Minister of Works, Senator David Umahi, had ordered the intervention after inspecting a vandalised section where bolts and iron rods had been removed.
He said the emergency works will include replacing the stolen components and repairing affected sections of the bridge, including portions of the carriageway and expansion joint steelworks.
With the closure just days away, motorists are being advised to use the Second Niger Bridge through Obosi towards Asaba in Delta State.
Federal Controller of Works in Anambra State, Mr Timothy Emenike, said appropriate traffic diversion arrangements, road signs, safety barriers and traffic control personnel would be deployed to guide motorists and minimise disruption.
According to the ministry said the repairs are necessary to restore the bridge to a safe and properly motorable condition.
The First Niger Bridge is a major transport gateway with a high volume of vehicular movement, meaning the closure could have significant implications for commuters, transport operators and businesses along the route.
Motorists are therefore advised to plan their journeys ahead and make use of the designated alternative route throughout the closure period.


